CC 11350 lift

Going in from above avoids dismantling a plant and saves downtime

Related downloads

The case

A fertilizer company in Southern Alberta, Canada, was updating and replacing aged components from the 1970’s in their nitrogen complex. The main item that needed replacing was a reactor vessel, which assists in creating urea to create fertilizer. The new vessel was made in Austria and the client required the most efficient way to get it installed at its final destination. So, four years before the actual exchange they engaged Mammoet. The early involvement enabled us to deliver and execute a comprehensive plan that optimized the overall approach that identified and seized several time saving opportunities.

Creative thinking and the right equipment minimize downtime

Using their global network, resources and longstanding expertise in factory-to-foundation projects. Mammoet orchestrated all transport modalities; barging, ocean transport, rail transport, jack & slide, and, fi nally SPMT transport. Mammoet ensured these modalities were well-aligned to one another in order to realize the most efficient logistics possible. To accommodate transport of the vessel Mammoet designed shipping saddles that were optimal for ocean and rail. The saddles eliminated the need to re-secure the vessel at each trans loading point. This helped save time and money and contributed to a safe journey for the vessel.

Assembly of LR 11350 Assembly of LR 11350

Arrival of new vessel

Arrival of new vessel

The original vessel, weighing 900,000lbs (appr. 410 metric tons) was located in a 70 meter high building. For its exchange, the client had originally planned to dismantle a side of the building. Within their extensive array of cranes, Mammoet were able to provide a LR 11350 – with a boom length of 126 meters and maximum lifting capacity of up to 1,350 metric tons, the crane would be able to perform the exchange without the need to dismantle and reconstruct part of the building. This reduced expensive downtime and reconstruction costs.

Mammoet’s comprehensive approach provided for a safe and efficient exchange of the reactor vessel, helping the customer to restart fertilizer production earlier than originally planned.

SPMT transport of old vessel for disposal Installation of new vessel

SPMT transport of old vessel for disposal                Installtion of new vessel